📦 Master Data Item
Memeriksa...
A
Admin
Administrator
Total Item0
📋 Daftar Item
Total Item Price0
$ Daftar Harga Item
Item Code Item Name Currency Price / Unit Hedging (%) Landed (%) Effective Date Modified By Modified Aksi
Total Currency0
💱 Daftar Exchange Rate
Total Category0
🏭 Daftar DL-FOH Category
Category IDDescriptionTypeRateCreatedAksi
Total Kapasitas0
⚡ Daftar Kapasitas Mesin
Total Mesin0
🔧 Daftar Mesin
Total Master BOM0
📐 Daftar Master BOM
BOM ID Product Customer Project Machine Lines Jumlah Item Created By Created Aksi
Total BOM0
📋 Daftar Bill of Material
Total Approved0
📜 History Transaksi BOM
🔑 Access Role & Workflow Management
🔄 Konfigurasi Workflow Approval BOM
⚙️ Konfigurasi level approval yang harus dilalui setiap BOM sebelum Approved. Maksimal 5 level. Drag & drop untuk mengubah urutan.
Daftar User & Role
UsernameNamaRoleAkses FormAksi
📐 Rumus COGM (Cost of Goods Manufactured)
COGM = Direct Material + Direct Labor + Manufacturing Overhead + Depreciation
         + WIP Awal − WIP Akhir
Komponen Definisi Satuan Menu Sumber
Direct MaterialTotal biaya material BOM (qty × harga × kurs)IDR / kmItem Price + Exchange Rate + Master BOM
Direct LaborUpah tenaga kerja langsung (rate/jam × jam/km)IDR / kmDL-FOH + Kapasitas Mesin
Manufacturing OverheadListrik, consumables, utilitas per kmIDR / kmDL-FOH (tipe FOH)
DepreciationPenyusutan mesin produksi per kmIDR / kmMaster Mesin + Kapasitas Mesin
WIP Awal / AkhirWork-in-Progress awal dan akhir periodeIDRBill of Material (header)
COGS = COGM + Finished Goods Awal − Finished Goods Akhir
Cost/km = COGM ÷ Total km diproduksi
Material% = Direct Material ÷ COGM × 100
🔗 Keterkaitan Antar Menu
Urutan pengisian data: dari kiri ke kanan. Data di kiri adalah prasyarat untuk menu di kanannya.
① Foundation
📦 Master Item
Kode & nama material
💱 Exchange Rate
Kurs USD → IDR historis
🔧 Master Mesin
Data aset mesin produksi
→
② Harga & Rate
💲 Item Price
Harga beli per material
🏭 DL-FOH
Rate labor & overhead/jam
⚡ Kapasitas Mesin
Produktivitas & jam/km
→
③ Template
📐 Master BOM
Template komponen per produk
Material lines + DL-FOH lines per machine line
→
④ Transaksi
📋 Bill of Material
BOM aktual per order produksi
📜 History BOM
Riwayat & audit trail BOM
→
⑤ Output
📊 COGS Summary
Laporan biaya produksi akhir
COGM → COGS per periode
🧮 Rumus Detail per Menu
💲 Item Price → Direct Material Cost
qty_efektif = qty_per_km × (1 + waste%)
biaya_IDR = qty_efektif × harga × kurs
Direct Material = Σ biaya_IDR semua item
🏭 DL-FOH + ⚡ Kapasitas → Labor & Overhead
jam_per_km = kapasitas_mesin (jam)
Direct Labor = rate_DL (IDR/jam) × jam_per_km
Overhead = rate_FOH (IDR/jam) × jam_per_km
🔧 Master Mesin + ⚡ Kapasitas → Depreciation
depresiasi/jam = nilai_aset ÷ umur_ekonomis
                  ÷ jam_kerja_per_tahun
Depreciation = depresiasi/jam × jam_per_km
💱 Exchange Rate → Konversi Mata Uang
biaya_IDR = biaya_USD × kurs_historis
kurs diambil dari tanggal transaksi
(bukan kurs hari ini / real-time)
📊 Benchmark Komposisi COGM — Kabel Fiber Optic
60–75%
Direct Material
Optical fiber, jacket, dll
8–15%
Direct Labor
Upah tenaga produksi
10–20%
Overhead (FOH)
Listrik, utilitas
3–8%
Depreciation
Penyusutan mesin
⚠️ Red Flags yang Perlu Diinvestigasi:
• Material cost > 80% → cek harga beli, kurs, atau waste factor
• Labor cost > 20% → cek efisiensi jam kerja atau lembur berlebihan
• WIP Akhir >> WIP Awal → ada PO yang tidak selesai tepat waktu
• Cost/km naik > 10% MoM → perlu analisis per komponen
Total COGS Doc0
📊 Daftar COGS Summary
Nama COGSTanggal Jumlah BOM Total COGS IDR Total COGS USD KeteranganAksi
🔌 Status Koneksi Database
Status—
Server URL—
Server Time—
Versi—
Latency—
Total Data—
Pengguna Login—
Last Check—